TruexCullins Workplace Studio   Heritage Aviation
 
 
  Heritage Aviation   Ben & Jerry’s Homemade, Inc. Corporate Headquarters  
DuBois & King Office Building Vermont Student Assistance Corporation
Mount Independence Winooski Redevelopment
Hanover South Block Flynn Center for the Performing Arts
Tally Systems Headquarters Vermont Teddy Bear
Burton Snowboards Corporate Headquarters United States Border Station
Heritage Aviation
SOUTH Burlington, Vermont

This renovation of a vacant 60,000 SF Army National Guard hangar, is located at the south end of the Burlington International Airport. A new addition also includes a two-story passenger lobby with commanding views through two-story glass windows. The structure now has a high-performance exterior envelope including insulated metal panels, thermally efficient windows and a new high-insulation-value roof. Interior renovations utilized sustainably and regionally-sourced interior finishes and LED lighting. The facility will function as a maintenance hangar, as well as an FBO (Fixed Base Operation). Another 11,000 SF addition provides the Customs and Border Protection Service with an air-side office. This project is currently on track to obtain LEED Silver Certification

Photos by Susan Teare

truexcullins award

 
previous work image
 
next work image
  vermont architecture + interior design

 

contact us | © truexcullins, inc. | architecture + interior design | burlington, vermont, usa | 802.658.2775 | 800.227.1076 | all rights reserved | web design by earthlogic

become a fan on facebook   follow us on twitter   return to home page